mai-logo

Dominican R. Master Plan & Power Loss Reduction

Under the Inter-American Development Bank (IDB) funding, Mercados – Aries International was assigned to undertake the “Distribution System Master Plan and Power System Loss Study for the Dominican Republic”.

The main goals were the following:

  • Elaborate an investment plan for the works needed to undertake the power distribution system expansion and loss reduction.
  • Assure the power demand according to market growth until 2030.
  • Assure the security and reliability of power system.
  • Assure an efficient development of the power system which complies with quality regulations fixed by the regulatory agency.
  • Propose a methodology to determine technical and non-technical losses.
  • Prioritize the investments proposed for the grid expansion projects.
  • Review the methodologies applied in the power loss reduction plans in order to obtain more sustainable results.
  • Assure the sustainability and low environmental impact of the best options.

Contact us.

Please feel free to contact us for any request or information.

Luis Cases

Networks Director


    Germán Nieto

    Head of Transmission


      en_GB