{"id":4391,"date":"2021-05-30T11:15:19","date_gmt":"2021-05-30T09:15:19","guid":{"rendered":"https:\/\/www.mercadosaries.com\/?post_type=project&#038;p=4391"},"modified":"2022-10-31T14:39:10","modified_gmt":"2022-10-31T13:39:10","slug":"fs-of-pv-plant-in-bosnia-herzegovina","status":"publish","type":"projects","link":"https:\/\/www.mai.group\/fr\/projects\/fs-of-pv-plant-in-bosnia-herzegovina\/","title":{"rendered":"FS d&#039;une centrale photovolta\u00efque en Bosnie-Herz\u00e9govine"},"content":{"rendered":"<figure class=\"wp-block-pullquote\" style=\"border-radius:16px;border-style:solid;border-width:3px\"><blockquote><p>L&#039;objectif du projet \u00e9tait l&#039;\u00e9tude de faisabilit\u00e9 d&#039;une centrale \u00e9lectrique photovolta\u00efque connect\u00e9e au r\u00e9seau en Bosnie-Herz\u00e9govine, avec une puissance install\u00e9e globale d&#039;environ 50 MWc.<\/p><\/blockquote><\/figure>\n\n\n\n<p>L&#039;\u00e9tendue des travaux comprenait la description g\u00e9n\u00e9rale de la technologie, apr\u00e8s avoir examin\u00e9 le march\u00e9, et l&#039;\u00e9valuation du site relative aux ressources solaires, aux risques d&#039;inondation, \u00e0 la disponibilit\u00e9 des terres, \u00e0 l&#039;acc\u00e8s, aux infrastructures et au raccordement au r\u00e9seau.<\/p>\n\n\n\n<p>MAI a effectu\u00e9 la configuration de la centrale photovolta\u00efque et examin\u00e9 les syst\u00e8mes de connexion et d&#039;int\u00e9gration au r\u00e9seau, ainsi que la strat\u00e9gie d&#039;exploitation et de maintenance (O&amp;M). D&#039;autre part, MAI a r\u00e9alis\u00e9 l&#039;\u00e9valuation des permis, les \u00e9valuations d&#039;impact environnemental et social, l&#039;estimation CAPEX\/OPEX et l&#039;examen des risques financiers et commerciaux.<\/p>","protected":false},"featured_media":5233,"parent":0,"menu_order":0,"template":"","zone":[52],"project_category":[24],"supply":[57],"budget":[],"country":[],"class_list":["post-4391","projects","type-projects","status-publish","has-post-thumbnail","hentry","zone-europe","project_category-sustainable-generation","supply-power"],"acf":[],"_links":{"self":[{"href":"https:\/\/www.mai.group\/fr\/wp-json\/wp\/v2\/projects\/4391","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.mai.group\/fr\/wp-json\/wp\/v2\/projects"}],"about":[{"href":"https:\/\/www.mai.group\/fr\/wp-json\/wp\/v2\/types\/projects"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.mai.group\/fr\/wp-json\/wp\/v2\/media\/5233"}],"wp:attachment":[{"href":"https:\/\/www.mai.group\/fr\/wp-json\/wp\/v2\/media?parent=4391"}],"wp:term":[{"taxonomy":"zone","embeddable":true,"href":"https:\/\/www.mai.group\/fr\/wp-json\/wp\/v2\/zone?post=4391"},{"taxonomy":"project_category","embeddable":true,"href":"https:\/\/www.mai.group\/fr\/wp-json\/wp\/v2\/project_category?post=4391"},{"taxonomy":"supply","embeddable":true,"href":"https:\/\/www.mai.group\/fr\/wp-json\/wp\/v2\/supply?post=4391"},{"taxonomy":"budget","embeddable":true,"href":"https:\/\/www.mai.group\/fr\/wp-json\/wp\/v2\/budget?post=4391"},{"taxonomy":"country","embeddable":true,"href":"https:\/\/www.mai.group\/fr\/wp-json\/wp\/v2\/country?post=4391"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}