{"id":1584,"date":"2020-03-31T17:27:54","date_gmt":"2020-03-31T15:27:54","guid":{"rendered":"https:\/\/www.mercadosaries.com\/?post_type=project&#038;p=1584"},"modified":"2022-11-04T11:33:40","modified_gmt":"2022-11-04T10:33:40","slug":"assessing-a-pv-project-in-spain","status":"publish","type":"projects","link":"https:\/\/www.mai.group\/fr\/projects\/assessing-a-pv-project-in-spain\/","title":{"rendered":"\u00c9valuation d&#039;un projet photovolta\u00efque en Espagne"},"content":{"rendered":"<p>Travaux:<\/p>\n\n\n\n<ul class=\"wp-block-list\"><li>Due Diligence de 20 MW PV<\/li><li>\u00c9valuations des ressources solaires et du rendement \u00e9nerg\u00e9tique<\/li><li>\u00c9valuation du site<\/li><li>Examen des permis et des licences<\/li><li>V\u00e9rification de contract<\/li><li>Revue des actionnaires<\/li><\/ul>\n\n\n\n<p><\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Conseil technique du pr\u00eateur pour 20 MW PV en Espagne<\/h2>\n\n\n\n<p>L&#039;\u00e9valuation comprenait l&#039;examen g\u00e9n\u00e9ral du projet des installations et des \u00e9quipements techniques majeurs, avec \u00e9valuation des acc\u00e8s et du site. Les permis et licences ont \u00e9t\u00e9 v\u00e9rifi\u00e9s concernant, entre autres, les permis d&#039;activit\u00e9, de construction et d&#039;exploitation, ainsi que les certificats tels que le certificat d&#039;ach\u00e8vement final ou le certificat de mise en service. Nous avons effectu\u00e9 les \u00e9valuations des ressources solaires et du rendement \u00e9nerg\u00e9tique de la centrale photovolta\u00efque sur la base des mesures mesur\u00e9es sur les compteurs MT. De plus, nous avons examin\u00e9 les actionnaires et les contrats du projet, tels que l&#039;O&amp;M, l&#039;assurance ou la location de terrains.<\/p>\n\n\n\n<figure class=\"wp-block-pullquote\"><blockquote><p>\u00ab L&#039;implication d&#039;AF Aries est all\u00e9e au-del\u00e0 de ce qui \u00e9tait strictement contractuel. Son professionnalisme et le haut niveau de qualit\u00e9 de son travail ont \u00e9t\u00e9 essentiels \u00e0 la r\u00e9ussite de l&#039;op\u00e9ration. Il s\u2019agit certainement d\u2019un bon partenaire en qui nous aurons confiance \u00e0 l\u2019avenir.<\/p><\/blockquote><\/figure>","protected":false},"featured_media":1704,"parent":0,"menu_order":0,"template":"","zone":[52],"project_category":[24,74],"supply":[57],"budget":[],"country":[],"class_list":["post-1584","projects","type-projects","status-publish","has-post-thumbnail","hentry","zone-europe","project_category-sustainable-generation","project_category-technical-consulting","supply-power"],"acf":[],"_links":{"self":[{"href":"https:\/\/www.mai.group\/fr\/wp-json\/wp\/v2\/projects\/1584","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.mai.group\/fr\/wp-json\/wp\/v2\/projects"}],"about":[{"href":"https:\/\/www.mai.group\/fr\/wp-json\/wp\/v2\/types\/projects"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.mai.group\/fr\/wp-json\/wp\/v2\/media\/1704"}],"wp:attachment":[{"href":"https:\/\/www.mai.group\/fr\/wp-json\/wp\/v2\/media?parent=1584"}],"wp:term":[{"taxonomy":"zone","embeddable":true,"href":"https:\/\/www.mai.group\/fr\/wp-json\/wp\/v2\/zone?post=1584"},{"taxonomy":"project_category","embeddable":true,"href":"https:\/\/www.mai.group\/fr\/wp-json\/wp\/v2\/project_category?post=1584"},{"taxonomy":"supply","embeddable":true,"href":"https:\/\/www.mai.group\/fr\/wp-json\/wp\/v2\/supply?post=1584"},{"taxonomy":"budget","embeddable":true,"href":"https:\/\/www.mai.group\/fr\/wp-json\/wp\/v2\/budget?post=1584"},{"taxonomy":"country","embeddable":true,"href":"https:\/\/www.mai.group\/fr\/wp-json\/wp\/v2\/country?post=1584"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}