{"id":6362,"date":"2022-04-27T09:12:25","date_gmt":"2022-04-27T07:12:25","guid":{"rendered":"https:\/\/www.mercadosaries.com\/?p=6362"},"modified":"2022-12-01T09:45:28","modified_gmt":"2022-12-01T08:45:28","slug":"project-implementation-consultant-for-wind-plant-in-uzbekistan","status":"publish","type":"post","link":"https:\/\/www.mai.group\/fr\/project-implementation-consultant-for-wind-plant-in-uzbekistan\/","title":{"rendered":"Consultant en mise en \u0153uvre de projet pour une centrale \u00e9olienne en Ouzb\u00e9kistan"},"content":{"rendered":"<p>Nous d\u00e9veloppons nos op\u00e9rations dans le domaine des \u00e9nergies renouvelables <strong>Ouzb\u00e9kistan<\/strong> en agissant comme <strong>Soci\u00e9t\u00e9 de gestion de projet (Ing\u00e9nieur des propri\u00e9taires)<\/strong> pour un nouveau <strong>Centrale \u00e9olienne<\/strong> d&#039;une capacit\u00e9 de 500 MW.<\/p>\n\n\n\n<p>En tant que consultants en mise en \u0153uvre de projet, nous garantirons la bonne ex\u00e9cution en termes de qualit\u00e9 et de calendrier de l\u2019ing\u00e9nierie de d\u00e9tail approuv\u00e9e telle qu\u2019elle est \u00e9rig\u00e9e sur site. En outre, nous v\u00e9rifierons \u00e9galement les marques rouges et le package \u00ab as-built \u00bb et fournirons des services d\u2019assistance et de v\u00e9rification de la proc\u00e9dure de mise en service et de l\u2019ex\u00e9cution sur site.<\/p>\n\n\n\n<p>&nbsp;Notre \u00e9quipe d&#039;experts est dirig\u00e9e par Juan Jos\u00e9 Lopez, consultant ex\u00e9cutif et chef de projet, que vous pouvez contacter pour plus d&#039;informations sur ce projet.<\/p>","protected":false},"excerpt":{"rendered":"<p>We are expanding our renewable energies operations in Uzbekistan by acting as Project Management Company (Owners\u2019 Engineer) for a new Wind Power Plant with a 500 MW capacity. As Project Implementation Consultants we will ensure the proper execution in terms of quality and schedule of the approved detail engineering as is erected on site. Furthermore, [&hellip;]<\/p>\n","protected":false},"author":9,"featured_media":6366,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"_seopress_robots_primary_cat":"","_seopress_titles_title":"","_seopress_titles_desc":"","_seopress_robots_index":"","footnotes":""},"categories":[28,36,26],"tags":[41,38,40,39],"class_list":["post-6362","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news","category-projects","category-renewables","tag-pic","tag-renewables","tag-uzbekistan","tag-wind"],"acf":[],"_links":{"self":[{"href":"https:\/\/www.mai.group\/fr\/wp-json\/wp\/v2\/posts\/6362","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.mai.group\/fr\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.mai.group\/fr\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.mai.group\/fr\/wp-json\/wp\/v2\/users\/9"}],"replies":[{"embeddable":true,"href":"https:\/\/www.mai.group\/fr\/wp-json\/wp\/v2\/comments?post=6362"}],"version-history":[{"count":2,"href":"https:\/\/www.mai.group\/fr\/wp-json\/wp\/v2\/posts\/6362\/revisions"}],"predecessor-version":[{"id":11810,"href":"https:\/\/www.mai.group\/fr\/wp-json\/wp\/v2\/posts\/6362\/revisions\/11810"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.mai.group\/fr\/wp-json\/wp\/v2\/media\/6366"}],"wp:attachment":[{"href":"https:\/\/www.mai.group\/fr\/wp-json\/wp\/v2\/media?parent=6362"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.mai.group\/fr\/wp-json\/wp\/v2\/categories?post=6362"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.mai.group\/fr\/wp-json\/wp\/v2\/tags?post=6362"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}