{"id":3243,"date":"2020-08-03T10:54:12","date_gmt":"2020-08-03T08:54:12","guid":{"rendered":"https:\/\/www.mercadosaries.com\/?p=3243"},"modified":"2022-10-28T14:01:47","modified_gmt":"2022-10-28T12:01:47","slug":"project-extension-albania","status":"publish","type":"post","link":"https:\/\/www.mai.group\/fr\/project-extension-albania\/","title":{"rendered":"Extension du projet en Albanie"},"content":{"rendered":"<p>Nous sommes heureux de communiquer que la signature de l&#039;amendement 6 pour le projet \u00ab<strong>R\u00e9cup\u00e9ration d\u2019\u00e9lectricit\u00e9 en Albanie<\/strong>&quot; a eu lieu.<\/p>\n\n\n\n<p>Ainsi, les services de Conseil d\u00e9velopp\u00e9s par <strong>Mercados \u2013 B\u00e9lier intentionnel<\/strong> pour l\u2019assistance technique \u00e0 l\u2019unit\u00e9 de gestion du projet (UGP) et aux unit\u00e9s de mise en \u0153uvre du projet de r\u00e9cup\u00e9ration d\u2019\u00e9nergie se poursuivra au cours de l\u2019ann\u00e9e 2020.<\/p>\n\n\n\n<p>Le projet vise \u00e0 am\u00e9liorer la fiabilit\u00e9 de l&#039;approvisionnement en \u00e9lectricit\u00e9 et la viabilit\u00e9 financi\u00e8re du secteur de l&#039;\u00e9lectricit\u00e9 en modernisant plusieurs installations de distribution et de transport, permettant ainsi des r\u00e9formes du secteur de l&#039;\u00e9lectricit\u00e9 et en optimisant son cadre global.<\/p>\n\n\n\n<p><strong>Mercados \u2013 B\u00e9lier intentionnel<\/strong> est tr\u00e8s actif en Albanie, soutenant depuis plus de 15 ans le gouvernement albanais et plusieurs institutions. Nous soutenons le d\u00e9veloppement et la modernisation du secteur de l&#039;\u00e9nergie sous diff\u00e9rents angles (march\u00e9, distribution, transport). Si vous souhaitez en savoir plus sur nos activit\u00e9s en Albanie, contactez-nous.<\/p>","protected":false},"excerpt":{"rendered":"<p>We are pleased to communicate that the signing of Amendment 6 for the Project \u201cAlbania Power Recovery\u201d took place. This way, the Consultancy services developed by Mercados \u2013 Aries Intentional for the Technical Assistance to the Project Management Unit (PMU) and Implementation Units for the Power Recovery Project will continue during the year 2020. The [&hellip;]<\/p>\n","protected":false},"author":9,"featured_media":3246,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"_seopress_robots_primary_cat":"","_seopress_titles_title":"","_seopress_titles_desc":"","_seopress_robots_index":"","footnotes":""},"categories":[28],"tags":[],"class_list":["post-3243","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news"],"acf":[],"_links":{"self":[{"href":"https:\/\/www.mai.group\/fr\/wp-json\/wp\/v2\/posts\/3243","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.mai.group\/fr\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.mai.group\/fr\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.mai.group\/fr\/wp-json\/wp\/v2\/users\/9"}],"replies":[{"embeddable":true,"href":"https:\/\/www.mai.group\/fr\/wp-json\/wp\/v2\/comments?post=3243"}],"version-history":[{"count":0,"href":"https:\/\/www.mai.group\/fr\/wp-json\/wp\/v2\/posts\/3243\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.mai.group\/fr\/wp-json\/wp\/v2\/media\/3246"}],"wp:attachment":[{"href":"https:\/\/www.mai.group\/fr\/wp-json\/wp\/v2\/media?parent=3243"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.mai.group\/fr\/wp-json\/wp\/v2\/categories?post=3243"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.mai.group\/fr\/wp-json\/wp\/v2\/tags?post=3243"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}