{"id":11616,"date":"2022-11-14T13:52:47","date_gmt":"2022-11-14T12:52:47","guid":{"rendered":"https:\/\/www.mercadosaries.com\/?p=11616"},"modified":"2022-11-14T13:52:48","modified_gmt":"2022-11-14T12:52:48","slug":"technical-advisory-services-for-tender-process-of-2-x-500-mwac-pv-in-oman","status":"publish","type":"post","link":"https:\/\/www.mai.group\/fr\/technical-advisory-services-for-tender-process-of-2-x-500-mwac-pv-in-oman\/","title":{"rendered":"Services de conseil technique pour le processus d&#039;appel d&#039;offres pour 2 x 500 MWac PV \u00e0 Oman"},"content":{"rendered":"<p>Nous sommes tr\u00e8s fiers de fournir des services de conseil technique pour deux projets solaires photovolta\u00efques IPP d&#039;une capacit\u00e9 combin\u00e9e de 1 GWac \u00e0 Oman, en aidant le client avec les aspects techniques de l&#039;offre pendant le processus d&#039;appel d&#039;offres lanc\u00e9 pour le d\u00e9veloppement, la conception, l&#039;autorisation, l&#039;ing\u00e9nierie. , financement, approvisionnement, construction, mise en service, essais, ach\u00e8vement, propri\u00e9t\u00e9, assurance, exploitation et maintenance des deux usines. <\/p>","protected":false},"excerpt":{"rendered":"<p>We are very proud to provide Technical Advisory Services for two Solar PV IPP Projects with a combined capacity of 1 GWac in Oman, by supporting the Client with the technical aspects of the bid during the tender process launched for the development, design, permitting, engineering, financing, procurement, construction, commissioning, testing, completion, ownership, insurance, operation [&hellip;]<\/p>\n","protected":false},"author":9,"featured_media":6774,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"_seopress_robots_primary_cat":"","_seopress_titles_title":"","_seopress_titles_desc":"","_seopress_robots_index":"","footnotes":""},"categories":[28,36,26],"tags":[],"class_list":["post-11616","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news","category-projects","category-renewables"],"acf":[],"_links":{"self":[{"href":"https:\/\/www.mai.group\/fr\/wp-json\/wp\/v2\/posts\/11616","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.mai.group\/fr\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.mai.group\/fr\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.mai.group\/fr\/wp-json\/wp\/v2\/users\/9"}],"replies":[{"embeddable":true,"href":"https:\/\/www.mai.group\/fr\/wp-json\/wp\/v2\/comments?post=11616"}],"version-history":[{"count":3,"href":"https:\/\/www.mai.group\/fr\/wp-json\/wp\/v2\/posts\/11616\/revisions"}],"predecessor-version":[{"id":11622,"href":"https:\/\/www.mai.group\/fr\/wp-json\/wp\/v2\/posts\/11616\/revisions\/11622"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.mai.group\/fr\/wp-json\/wp\/v2\/media\/6774"}],"wp:attachment":[{"href":"https:\/\/www.mai.group\/fr\/wp-json\/wp\/v2\/media?parent=11616"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.mai.group\/fr\/wp-json\/wp\/v2\/categories?post=11616"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.mai.group\/fr\/wp-json\/wp\/v2\/tags?post=11616"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}