{"id":4366,"date":"2021-05-30T11:12:49","date_gmt":"2021-05-30T09:12:49","guid":{"rendered":"https:\/\/www.mercadosaries.com\/?post_type=project&#038;p=4366"},"modified":"2022-10-31T13:24:32","modified_gmt":"2022-10-31T12:24:32","slug":"design-and-implementation-of-a-battery-energy-storage-system-of-1mwh-of-capacity-in-cape-verde","status":"publish","type":"projects","link":"https:\/\/www.mai.group\/es\/projects\/design-and-implementation-of-a-battery-energy-storage-system-of-1mwh-of-capacity-in-cape-verde\/","title":{"rendered":"Dise\u00f1o e implementaci\u00f3n de un Sistema de Almacenamiento de Energ\u00eda en Bater\u00edas de 1MWh de capacidad en Cabo Verde"},"content":{"rendered":"<p>Cabo Verde est\u00e1 llevando a cabo un proyecto piloto sobre almacenamiento de energ\u00eda en bater\u00edas para la integraci\u00f3n de energ\u00edas renovables. <\/p>\n\n\n\n<p><strong>En MAI<\/strong> particip\u00f3 en el Proyecto realizando los siguientes servicios:<\/p>\n\n\n\n<ul class=\"wp-block-list\"><li>Modelado de sistemas y redes y estudios din\u00e1micos de la red de distribuci\u00f3n de Cabo Verde.<\/li><li>Identificaci\u00f3n de limitaciones de integraci\u00f3n y operaci\u00f3n.<\/li><li>Determinaci\u00f3n de la capacidad m\u00e1xima de integraci\u00f3n de fuentes de energ\u00eda renovables.<\/li><li>Requisitos de mejora a corto y largo plazo.<\/li><li>Evaluaci\u00f3n del dimensionamiento de bater\u00edas en base a la capacidad instalada de RES, caracter\u00edsticas y an\u00e1lisis de variaci\u00f3n hist\u00f3rica de la producci\u00f3n.<\/li><li>Desarrollo de especificaciones t\u00e9cnicas y adquisici\u00f3n de un piloto de bater\u00eda conectada a la red en la isla para abordar las variaciones de RES, la calidad del sistema y minimizar las limitaciones de RES (bater\u00eda de aplicaciones m\u00faltiples).<\/li><li>Gesti\u00f3n y Supervisi\u00f3n de la implementaci\u00f3n y puesta en marcha del piloto de bater\u00edas.<\/li><\/ul>","protected":false},"featured_media":5246,"parent":0,"menu_order":0,"template":"","zone":[55],"project_category":[34],"supply":[57],"budget":[],"country":[],"class_list":["post-4366","projects","type-projects","status-publish","has-post-thumbnail","hentry","zone-sub-saharan-africa","project_category-storage-p2g","supply-power"],"acf":[],"_links":{"self":[{"href":"https:\/\/www.mai.group\/es\/wp-json\/wp\/v2\/projects\/4366","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.mai.group\/es\/wp-json\/wp\/v2\/projects"}],"about":[{"href":"https:\/\/www.mai.group\/es\/wp-json\/wp\/v2\/types\/projects"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.mai.group\/es\/wp-json\/wp\/v2\/media\/5246"}],"wp:attachment":[{"href":"https:\/\/www.mai.group\/es\/wp-json\/wp\/v2\/media?parent=4366"}],"wp:term":[{"taxonomy":"zone","embeddable":true,"href":"https:\/\/www.mai.group\/es\/wp-json\/wp\/v2\/zone?post=4366"},{"taxonomy":"project_category","embeddable":true,"href":"https:\/\/www.mai.group\/es\/wp-json\/wp\/v2\/project_category?post=4366"},{"taxonomy":"supply","embeddable":true,"href":"https:\/\/www.mai.group\/es\/wp-json\/wp\/v2\/supply?post=4366"},{"taxonomy":"budget","embeddable":true,"href":"https:\/\/www.mai.group\/es\/wp-json\/wp\/v2\/budget?post=4366"},{"taxonomy":"country","embeddable":true,"href":"https:\/\/www.mai.group\/es\/wp-json\/wp\/v2\/country?post=4366"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}