{"id":4220,"date":"2021-03-30T11:48:16","date_gmt":"2021-03-30T09:48:16","guid":{"rendered":"https:\/\/www.mercadosaries.com\/?post_type=project&#038;p=4220"},"modified":"2022-10-31T14:22:28","modified_gmt":"2022-10-31T13:22:28","slug":"feasibility-study-and-project-preparation-for-smart-metering-program-in-uzbekistan","status":"publish","type":"projects","link":"https:\/\/www.mai.group\/es\/projects\/feasibility-study-and-project-preparation-for-smart-metering-program-in-uzbekistan\/","title":{"rendered":"Estudio de viabilidad y preparaci\u00f3n de proyecto para el programa de medici\u00f3n inteligente en Uzbekist\u00e1n"},"content":{"rendered":"<figure class=\"wp-block-pullquote\" style=\"border-radius:16px;border-style:solid;border-width:3px\"><blockquote><p><strong>\u00a0En MAI<\/strong> llev\u00f3 a cabo el estudio de factibilidad destinado a mejorar las operaciones del sistema de distribuci\u00f3n, reducir las p\u00e9rdidas t\u00e9cnicas y comerciales y aumentar la recaudaci\u00f3n de ingresos de los clientes.<\/p><\/blockquote><\/figure>\n\n\n\n<p><br>El Gobierno de la Rep\u00fablica de Uzbekist\u00e1n decidi\u00f3 implementar un proyecto de medici\u00f3n avanzada de electricidad en todo el pa\u00eds. El proyecto abarc\u00f3 las regiones de Ferghana, Andijan, Namangan, Kashkadarya y Surkhandarya.<\/p>\n\n\n\n<p>Este Proyecto de Medici\u00f3n Avanzada de Electricidad instal\u00f3 m\u00e1s de 2,6 millones de medidores de electricidad avanzados y equipos asociados. El sistema integrado de gesti\u00f3n de datos de contadores instalado en el proyecto comprende infraestructura de medici\u00f3n avanzada, gesti\u00f3n de datos de energ\u00eda, facturaci\u00f3n, archivo y sistemas de gesti\u00f3n de relaciones con los clientes. El proyecto tambi\u00e9n incluy\u00f3 un programa de informaci\u00f3n p\u00fablica, un plan de acci\u00f3n de g\u00e9nero y un programa de desarrollo de capacidades para la mejora operativa y la reducci\u00f3n de p\u00e9rdidas comerciales. La agencia ejecutora del proyecto era una empresa estatal de servicios p\u00fablicos integrada verticalmente.<\/p>","protected":false},"featured_media":5250,"parent":0,"menu_order":0,"template":"","zone":[50],"project_category":[22],"supply":[57],"budget":[],"country":[],"class_list":["post-4220","projects","type-projects","status-publish","has-post-thumbnail","hentry","zone-cis-countries","project_category-networks-smart-grids","supply-power"],"acf":[],"_links":{"self":[{"href":"https:\/\/www.mai.group\/es\/wp-json\/wp\/v2\/projects\/4220","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.mai.group\/es\/wp-json\/wp\/v2\/projects"}],"about":[{"href":"https:\/\/www.mai.group\/es\/wp-json\/wp\/v2\/types\/projects"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.mai.group\/es\/wp-json\/wp\/v2\/media\/5250"}],"wp:attachment":[{"href":"https:\/\/www.mai.group\/es\/wp-json\/wp\/v2\/media?parent=4220"}],"wp:term":[{"taxonomy":"zone","embeddable":true,"href":"https:\/\/www.mai.group\/es\/wp-json\/wp\/v2\/zone?post=4220"},{"taxonomy":"project_category","embeddable":true,"href":"https:\/\/www.mai.group\/es\/wp-json\/wp\/v2\/project_category?post=4220"},{"taxonomy":"supply","embeddable":true,"href":"https:\/\/www.mai.group\/es\/wp-json\/wp\/v2\/supply?post=4220"},{"taxonomy":"budget","embeddable":true,"href":"https:\/\/www.mai.group\/es\/wp-json\/wp\/v2\/budget?post=4220"},{"taxonomy":"country","embeddable":true,"href":"https:\/\/www.mai.group\/es\/wp-json\/wp\/v2\/country?post=4220"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}