{"id":2750,"date":"2020-06-10T16:25:43","date_gmt":"2020-06-10T14:25:43","guid":{"rendered":"https:\/\/www.mercadosaries.com\/?post_type=project&#038;p=2750"},"modified":"2022-10-31T17:46:18","modified_gmt":"2022-10-31T16:46:18","slug":"preparing-the-rajasthan-renewable-energy-transmission-in-india","status":"publish","type":"projects","link":"https:\/\/www.mai.group\/es\/projects\/preparing-the-rajasthan-renewable-energy-transmission-in-india\/","title":{"rendered":"Preparando la transmisi\u00f3n de energ\u00eda renovable de Rajasthan en India"},"content":{"rendered":"<p>Para <strong>Mercados \u2013 Aries Internacional<\/strong>, el objetivo principal de la tarea era ayudar a la compa\u00f1\u00eda de transmisi\u00f3n en Rajasthan (India) (RVPN) a revisar la planificaci\u00f3n y operaci\u00f3n del sistema de transmisi\u00f3n existente para dar cabida a una penetraci\u00f3n significativa de energ\u00eda renovable en la red, compartir experiencias internacionales adecuadas y tambi\u00e9n apoyar la evaluaci\u00f3n de varias alternativas para permitir un funcionamiento fluido y fiable del sistema de transmisi\u00f3n utilizando el mecanismo de financiaci\u00f3n de tramos m\u00faltiples propuesto.<\/p>\n\n\n\n<p><\/p>\n\n\n\n<div class=\"wp-block-media-text alignwide has-media-on-the-right is-stacked-on-mobile is-vertically-aligned-center is-style-default\" style=\"grid-template-columns:auto 42%\"><figure class=\"wp-block-media-text__media\"><img fetchpriority=\"high\" decoding=\"async\" width=\"768\" height=\"1024\" src=\"https:\/\/www.mai.group\/wp-content\/uploads\/2020\/06\/harsh-fuloria-ipH7NTgLuNs-unsplash-768x1024.jpg\" alt=\"\" class=\"wp-image-2757 size-full\" srcset=\"https:\/\/www.mai.group\/wp-content\/uploads\/2020\/06\/harsh-fuloria-ipH7NTgLuNs-unsplash-768x1024.jpg 768w, https:\/\/www.mai.group\/wp-content\/uploads\/2020\/06\/harsh-fuloria-ipH7NTgLuNs-unsplash-225x300.jpg 225w, https:\/\/www.mai.group\/wp-content\/uploads\/2020\/06\/harsh-fuloria-ipH7NTgLuNs-unsplash-1152x1536.jpg 1152w, https:\/\/www.mai.group\/wp-content\/uploads\/2020\/06\/harsh-fuloria-ipH7NTgLuNs-unsplash-1536x2048.jpg 1536w, https:\/\/www.mai.group\/wp-content\/uploads\/2020\/06\/harsh-fuloria-ipH7NTgLuNs-unsplash-1080x1440.jpg 1080w, https:\/\/www.mai.group\/wp-content\/uploads\/2020\/06\/harsh-fuloria-ipH7NTgLuNs-unsplash-1280x1707.jpg 1280w, https:\/\/www.mai.group\/wp-content\/uploads\/2020\/06\/harsh-fuloria-ipH7NTgLuNs-unsplash-980x1307.jpg 980w, https:\/\/www.mai.group\/wp-content\/uploads\/2020\/06\/harsh-fuloria-ipH7NTgLuNs-unsplash-480x640.jpg 480w, https:\/\/www.mai.group\/wp-content\/uploads\/2020\/06\/harsh-fuloria-ipH7NTgLuNs-unsplash-scaled.jpg 1920w\" sizes=\"(max-width: 768px) 100vw, 768px\" \/><\/figure><div class=\"wp-block-media-text__content\">\n<p><strong>Mercados \u2013 Aries Internacional<\/strong> actividades incluidas:<\/p>\n\n\n\n<ul class=\"wp-block-list\"><li data-ccp-props=\"{&quot;335551550&quot;:1,&quot;335551620&quot;:1,&quot;335559683&quot;:0,&quot;335559685&quot;:0,&quot;335559731&quot;:0,&quot;335559737&quot;:0,&quot;335562764&quot;:2,&quot;335562765&quot;:0.9,&quot;335562766&quot;:4,&quot;335562767&quot;:10,&quot;335562768&quot;:4,&quot;335562769&quot;:0}\">Revise el informe detallado del proyecto preparado por RVPN para el sistema de evacuaci\u00f3n de transmisi\u00f3n de energ\u00eda a granel en el oeste de Rajasthan, incluida la configuraci\u00f3n del dise\u00f1o, el modo de adquisici\u00f3n, el paquete del contrato y las estimaciones de costos.<\/li><li data-ccp-props=\"{&quot;335551550&quot;:1,&quot;335551620&quot;:1,&quot;335559683&quot;:0,&quot;335559685&quot;:0,&quot;335559731&quot;:0,&quot;335559737&quot;:0,&quot;335562764&quot;:2,&quot;335562765&quot;:0.9,&quot;335562766&quot;:4,&quot;335562767&quot;:10,&quot;335562768&quot;:4,&quot;335562769&quot;:0}\">Revisar los resultados del flujo de carga en el informe detallado del proyecto propuesto para desarrollar y evacuar 4.200 MW de energ\u00eda renovable.<\/li><li data-ccp-props=\"{&quot;335551550&quot;:1,&quot;335551620&quot;:1,&quot;335559683&quot;:0,&quot;335559685&quot;:0,&quot;335559731&quot;:0,&quot;335559737&quot;:0,&quot;335562764&quot;:2,&quot;335562765&quot;:0.9,&quot;335562766&quot;:4,&quot;335562767&quot;:10,&quot;335562768&quot;:4,&quot;335562769&quot;:0}\">Revisar los procedimientos de operaci\u00f3n del sistema de transmisi\u00f3n.<\/li><li data-ccp-props=\"{&quot;335551550&quot;:1,&quot;335551620&quot;:1,&quot;335559683&quot;:0,&quot;335559685&quot;:0,&quot;335559731&quot;:0,&quot;335559737&quot;:0,&quot;335562764&quot;:2,&quot;335562765&quot;:0.9,&quot;335562766&quot;:4,&quot;335562767&quot;:10,&quot;335562768&quot;:4,&quot;335562769&quot;:0}\">Identifique y eval\u00fae opciones para garantizar un flujo de energ\u00eda fluido, confiable y predecible.<\/li><li data-ccp-props=\"{&quot;335551550&quot;:1,&quot;335551620&quot;:1,&quot;335559683&quot;:0,&quot;335559685&quot;:0,&quot;335559731&quot;:0,&quot;335559737&quot;:0,&quot;335562764&quot;:2,&quot;335562765&quot;:0.9,&quot;335562766&quot;:4,&quot;335562767&quot;:10,&quot;335562768&quot;:4,&quot;335562769&quot;:0}\">Apoyo en el desarrollo de una hoja de ruta para implementar centros de control de energ\u00edas renovables e infraestructura asociada y revisi\u00f3n de especificaciones t\u00e9cnicas, estimaciones de costos, empaquetamiento y cronograma de implementaci\u00f3n.<\/li><li data-ccp-props=\"{&quot;335551550&quot;:1,&quot;335551620&quot;:1,&quot;335559683&quot;:0,&quot;335559685&quot;:0,&quot;335559731&quot;:0,&quot;335559737&quot;:0,&quot;335562764&quot;:2,&quot;335562765&quot;:0.9,&quot;335562766&quot;:4,&quot;335562767&quot;:10,&quot;335562768&quot;:4,&quot;335562769&quot;:0}\">Compartir experiencias internacionales.<\/li><li data-ccp-props=\"{&quot;335551550&quot;:1,&quot;335551620&quot;:1,&quot;335559683&quot;:0,&quot;335559685&quot;:0,&quot;335559731&quot;:0,&quot;335559737&quot;:0,&quot;335562764&quot;:2,&quot;335562765&quot;:0.9,&quot;335562766&quot;:4,&quot;335562767&quot;:10,&quot;335562768&quot;:4,&quot;335562769&quot;:0}\">Identificar el apoyo a la capacitaci\u00f3n y el desarrollo de capacidades.<\/li><li data-ccp-props=\"{&quot;335551550&quot;:1,&quot;335551620&quot;:1,&quot;335559683&quot;:0,&quot;335559685&quot;:0,&quot;335559731&quot;:0,&quot;335559737&quot;:0,&quot;335562764&quot;:2,&quot;335562765&quot;:0.9,&quot;335562766&quot;:4,&quot;335562767&quot;:10,&quot;335562768&quot;:4,&quot;335562769&quot;:0}\">Participa en b\u00fasqueda de hechos y otras misiones.<\/li><\/ul>\n<\/div><\/div>\n\n\n\n<p><\/p>\n\n\n\n<p>&nbsp;<\/p>","protected":false},"featured_media":2760,"parent":0,"menu_order":0,"template":"","zone":[54],"project_category":[22],"supply":[57],"budget":[],"country":[],"class_list":["post-2750","projects","type-projects","status-publish","has-post-thumbnail","hentry","zone-south-asia","project_category-networks-smart-grids","supply-power"],"acf":[],"_links":{"self":[{"href":"https:\/\/www.mai.group\/es\/wp-json\/wp\/v2\/projects\/2750","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.mai.group\/es\/wp-json\/wp\/v2\/projects"}],"about":[{"href":"https:\/\/www.mai.group\/es\/wp-json\/wp\/v2\/types\/projects"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.mai.group\/es\/wp-json\/wp\/v2\/media\/2760"}],"wp:attachment":[{"href":"https:\/\/www.mai.group\/es\/wp-json\/wp\/v2\/media?parent=2750"}],"wp:term":[{"taxonomy":"zone","embeddable":true,"href":"https:\/\/www.mai.group\/es\/wp-json\/wp\/v2\/zone?post=2750"},{"taxonomy":"project_category","embeddable":true,"href":"https:\/\/www.mai.group\/es\/wp-json\/wp\/v2\/project_category?post=2750"},{"taxonomy":"supply","embeddable":true,"href":"https:\/\/www.mai.group\/es\/wp-json\/wp\/v2\/supply?post=2750"},{"taxonomy":"budget","embeddable":true,"href":"https:\/\/www.mai.group\/es\/wp-json\/wp\/v2\/budget?post=2750"},{"taxonomy":"country","embeddable":true,"href":"https:\/\/www.mai.group\/es\/wp-json\/wp\/v2\/country?post=2750"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}