{"id":2638,"date":"2020-06-01T12:34:31","date_gmt":"2020-06-01T10:34:31","guid":{"rendered":"https:\/\/www.mercadosaries.com\/?post_type=project&#038;p=2638"},"modified":"2022-11-04T12:49:05","modified_gmt":"2022-11-04T11:49:05","slug":"capacity-building-and-technical-assistance-program-for-the-nigerian-power-distribution-sector","status":"publish","type":"projects","link":"https:\/\/www.mai.group\/es\/projects\/capacity-building-and-technical-assistance-program-for-the-nigerian-power-distribution-sector\/","title":{"rendered":"Programa de asistencia t\u00e9cnica y creaci\u00f3n de capacidad para el sector de distribuci\u00f3n de energ\u00eda de Nigeria"},"content":{"rendered":"<h2 class=\"wp-block-heading\">Incrementar la viabilidad del sector de distribuci\u00f3n de Nigeria<\/h2>\n\n\n\n<p>Este programa de apoyo a la Asociaci\u00f3n de Distribuidores de Electricidad de Nigeria (ANED), desarrollado por la agencia bilateral francesa AFD y apoyado por la UE, finaliz\u00f3 recientemente despu\u00e9s de brindar asistencia t\u00e9cnica y desarrollo de capacidades para apoyar la viabilidad del sector de distribuci\u00f3n de energ\u00eda y mejorar la bancabilidad de las empresas distribuidoras. <\/p>\n\n\n\n<p>Los tres a\u00f1os de asistencia t\u00e9cnica fueron dirigidos por un l\u00edder de equipo residente con el apoyo de un equipo multidisciplinario de expertos internacionales, lo que demostr\u00f3 la viabilidad de las inversiones y promovi\u00f3 el intercambio de experiencia y mejores pr\u00e1cticas entre DISCO.<\/p>\n\n\n\n<p><strong>N\u00fameros<\/strong>:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>15 proyectos de inversi\u00f3n aprobados.<\/li>\n\n\n\n<li>37M USD para proyectos de inversi\u00f3n aprobados.<\/li>\n\n\n\n<li>3 bases de datos cr\u00edticas construidas.<\/li>\n\n\n\n<li>37 directivos ejecutivos capacitados.<\/li>\n\n\n\n<li>2 seminarios sobre planes de mejora del desempe\u00f1o realizados.<\/li>\n\n\n\n<li>176 partes interesadas asistieron a los seminarios.<\/li>\n<\/ul>\n\n\n\n<p><strong>Obras<\/strong>:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Capacidad instalada: 200 MW.<\/li>\n\n\n\n<li>Procedimientos y registros de HSE.<\/li>\n\n\n\n<li>Desempe\u00f1o o fallas de componentes principales.<\/li>\n\n\n\n<li>Estrategia de repuestos.<\/li>\n\n\n\n<li>Presupuesto operativo.<\/li>\n<\/ul>","protected":false},"featured_media":2694,"parent":0,"menu_order":0,"template":"","zone":[55],"project_category":[35],"supply":[],"budget":[],"country":[],"class_list":["post-2638","projects","type-projects","status-publish","has-post-thumbnail","hentry","zone-sub-saharan-africa","project_category-environmental-social-gender"],"acf":[],"_links":{"self":[{"href":"https:\/\/www.mai.group\/es\/wp-json\/wp\/v2\/projects\/2638","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.mai.group\/es\/wp-json\/wp\/v2\/projects"}],"about":[{"href":"https:\/\/www.mai.group\/es\/wp-json\/wp\/v2\/types\/projects"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.mai.group\/es\/wp-json\/wp\/v2\/media\/2694"}],"wp:attachment":[{"href":"https:\/\/www.mai.group\/es\/wp-json\/wp\/v2\/media?parent=2638"}],"wp:term":[{"taxonomy":"zone","embeddable":true,"href":"https:\/\/www.mai.group\/es\/wp-json\/wp\/v2\/zone?post=2638"},{"taxonomy":"project_category","embeddable":true,"href":"https:\/\/www.mai.group\/es\/wp-json\/wp\/v2\/project_category?post=2638"},{"taxonomy":"supply","embeddable":true,"href":"https:\/\/www.mai.group\/es\/wp-json\/wp\/v2\/supply?post=2638"},{"taxonomy":"budget","embeddable":true,"href":"https:\/\/www.mai.group\/es\/wp-json\/wp\/v2\/budget?post=2638"},{"taxonomy":"country","embeddable":true,"href":"https:\/\/www.mai.group\/es\/wp-json\/wp\/v2\/country?post=2638"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}