{"id":1668,"date":"2020-04-01T12:44:19","date_gmt":"2020-04-01T10:44:19","guid":{"rendered":"https:\/\/www.mercadosaries.com\/?post_type=project&#038;p=1668"},"modified":"2022-10-31T17:26:14","modified_gmt":"2022-10-31T16:26:14","slug":"optimizing-the-power-generation-plans-in-kazakhstan","status":"publish","type":"projects","link":"https:\/\/www.mai.group\/es\/projects\/optimizing-the-power-generation-plans-in-kazakhstan\/","title":{"rendered":"Optimizaci\u00f3n de los planes de generaci\u00f3n de energ\u00eda en Kazajst\u00e1n"},"content":{"rendered":"<h2 class=\"wp-block-heading\">Obras:<\/h2>\n\n\n\n<ul class=\"wp-block-list\"><li>Software para el modelado a corto plazo: DigSilent<\/li><li>Software para el modelado a largo plazo: el software propietario de MAI, Ordena.<\/li><li>Se propusieron cuatro posibles escenarios de desarrollo.<\/li><li>Principales partes interesadas involucradas: Ministerio de Energ\u00eda, Compa\u00f1\u00eda Operadora de la Red El\u00e9ctrica de Kazajst\u00e1n (KEGOC),<\/li><li>Ministerio de Finanzas, Samruk Kayzana, varios IPP<\/li><\/ul>\n\n\n\n<p><\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Plan de generaci\u00f3n de menor coste para Kazajst\u00e1n<\/h2>\n\n\n\n<p>En el marco del programa Power the Future, financiado por USAID, MAI prepar\u00f3 un plan de expansi\u00f3n de menor costo hasta 2040. El resultado fue una visi\u00f3n estrat\u00e9gica para el desarrollo del sector energ\u00e9tico kazajo, con una comprensi\u00f3n clara de los costos de las pol\u00edticas y compromisos ambientales asumidos, definidos como \u00f3ptimos. planes de inversi\u00f3n en infraestructura de generaci\u00f3n y transmisi\u00f3n, y medidas pol\u00edticas necesarias para la adecuada implementaci\u00f3n de la estrategia de desarrollo. Se propusieron cuatro posibles escenarios de desarrollo: una econom\u00eda verde, un escenario optimista y dos escenarios b\u00e1sicos con precios de combustibles locales e internacionales. Se utiliz\u00f3 el modelo interno ORDENA con el objetivo de minimizar la inversi\u00f3n en el sistema el\u00e9ctrico y los costos de operaci\u00f3n.<\/p>","protected":false},"featured_media":1765,"parent":0,"menu_order":0,"template":"","zone":[50],"project_category":[23],"supply":[57],"budget":[],"country":[],"class_list":["post-1668","projects","type-projects","status-publish","has-post-thumbnail","hentry","zone-cis-countries","project_category-policy-regulation","supply-power"],"acf":[],"_links":{"self":[{"href":"https:\/\/www.mai.group\/es\/wp-json\/wp\/v2\/projects\/1668","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.mai.group\/es\/wp-json\/wp\/v2\/projects"}],"about":[{"href":"https:\/\/www.mai.group\/es\/wp-json\/wp\/v2\/types\/projects"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.mai.group\/es\/wp-json\/wp\/v2\/media\/1765"}],"wp:attachment":[{"href":"https:\/\/www.mai.group\/es\/wp-json\/wp\/v2\/media?parent=1668"}],"wp:term":[{"taxonomy":"zone","embeddable":true,"href":"https:\/\/www.mai.group\/es\/wp-json\/wp\/v2\/zone?post=1668"},{"taxonomy":"project_category","embeddable":true,"href":"https:\/\/www.mai.group\/es\/wp-json\/wp\/v2\/project_category?post=1668"},{"taxonomy":"supply","embeddable":true,"href":"https:\/\/www.mai.group\/es\/wp-json\/wp\/v2\/supply?post=1668"},{"taxonomy":"budget","embeddable":true,"href":"https:\/\/www.mai.group\/es\/wp-json\/wp\/v2\/budget?post=1668"},{"taxonomy":"country","embeddable":true,"href":"https:\/\/www.mai.group\/es\/wp-json\/wp\/v2\/country?post=1668"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}