{"id":1662,"date":"2020-04-01T12:40:16","date_gmt":"2020-04-01T10:40:16","guid":{"rendered":"https:\/\/www.mercadosaries.com\/?post_type=project&#038;p=1662"},"modified":"2022-10-31T14:02:33","modified_gmt":"2022-10-31T13:02:33","slug":"enabling-wind-projects-and-emissions-reductions-in-egypt","status":"publish","type":"projects","link":"https:\/\/www.mai.group\/es\/projects\/enabling-wind-projects-and-emissions-reductions-in-egypt\/","title":{"rendered":"Permitir proyectos e\u00f3licos y reducciones de emisiones en Egipto"},"content":{"rendered":"<h2 class=\"wp-block-heading\">Objetivos:<\/h2>\n\n\n\n<ul class=\"wp-block-list\"><li>Capacidad instalada: 250 MW<\/li><li>125 turbinas tipo G97<\/li><li>Altura del buje de la turbina de 71 m<\/li><li>PPA de 20 a\u00f1os para EETC<\/li><li>Reducciones de emisiones de 12.600.000 toneladas de CO2e durante los 21 a\u00f1os de vida de los proyectos<\/li><li>Contribuye a los objetivos de desarrollo sostenible de Egipto: alcanzar 20% de energ\u00edas renovables para 2022<\/li><\/ul>\n\n\n\n<p><\/p>\n\n\n\n<h2 class=\"wp-block-heading\">Desarrollo de capacidades en PPA e\u00f3licos BOO<\/h2>\n\n\n\n<p>El equipo de MAI PRS dise\u00f1\u00f3 e imparti\u00f3 un curso de capacitaci\u00f3n de dos semanas sobre los aspectos comerciales, t\u00e9cnicos, financieros y legales de los acuerdos de compra de energ\u00eda de proyectos e\u00f3licos, propiedad y operaci\u00f3n, para el operador del sistema de transmisi\u00f3n egipcio, EETC, en El Cairo. La formaci\u00f3n incluy\u00f3 tambi\u00e9n la organizaci\u00f3n de un viaje de estudios de dos semanas en Espa\u00f1a para la alta direcci\u00f3n de EETC, uno sobre mercados liberalizados y el otro sobre operaciones de plantas de energ\u00eda e\u00f3lica. El programa mejor\u00f3 la capacidad de los ejecutivos de EETC para implementar PPA complejos para proyectos de ER, cada vez m\u00e1s frecuentes en el ambicioso Programa de Desarrollo de ER de Egipto.<\/p>","protected":false},"featured_media":1758,"parent":0,"menu_order":0,"template":"","zone":[53],"project_category":[23],"supply":[],"budget":[],"country":[],"class_list":["post-1662","projects","type-projects","status-publish","has-post-thumbnail","hentry","zone-middle-east-and-north-africa","project_category-policy-regulation"],"acf":[],"_links":{"self":[{"href":"https:\/\/www.mai.group\/es\/wp-json\/wp\/v2\/projects\/1662","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.mai.group\/es\/wp-json\/wp\/v2\/projects"}],"about":[{"href":"https:\/\/www.mai.group\/es\/wp-json\/wp\/v2\/types\/projects"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.mai.group\/es\/wp-json\/wp\/v2\/media\/1758"}],"wp:attachment":[{"href":"https:\/\/www.mai.group\/es\/wp-json\/wp\/v2\/media?parent=1662"}],"wp:term":[{"taxonomy":"zone","embeddable":true,"href":"https:\/\/www.mai.group\/es\/wp-json\/wp\/v2\/zone?post=1662"},{"taxonomy":"project_category","embeddable":true,"href":"https:\/\/www.mai.group\/es\/wp-json\/wp\/v2\/project_category?post=1662"},{"taxonomy":"supply","embeddable":true,"href":"https:\/\/www.mai.group\/es\/wp-json\/wp\/v2\/supply?post=1662"},{"taxonomy":"budget","embeddable":true,"href":"https:\/\/www.mai.group\/es\/wp-json\/wp\/v2\/budget?post=1662"},{"taxonomy":"country","embeddable":true,"href":"https:\/\/www.mai.group\/es\/wp-json\/wp\/v2\/country?post=1662"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}