{"id":1602,"date":"2020-03-31T18:00:52","date_gmt":"2020-03-31T16:00:52","guid":{"rendered":"https:\/\/www.mercadosaries.com\/?post_type=project&#038;p=1602"},"modified":"2022-10-31T14:25:16","modified_gmt":"2022-10-31T13:25:16","slug":"feasibility-study-for-2x1mw-pv-plants-in-tanzania","status":"publish","type":"projects","link":"https:\/\/www.mai.group\/es\/projects\/feasibility-study-for-2x1mw-pv-plants-in-tanzania\/","title":{"rendered":"Estudio de viabilidad para plantas fotovoltaicas de 2x1MW en Tanzania"},"content":{"rendered":"<h2 class=\"wp-block-heading\">Tareas:<\/h2>\n\n\n\n<ul class=\"wp-block-list\"><li>Capacidad instalada: 2\u00d71 MW<\/li><li>Revisi\u00f3n de dise\u00f1o<\/li><li>Documental de licitaci\u00f3n<\/li><\/ul>\n\n\n\n<h2 class=\"wp-block-heading\">Servicios de Consultor\u00eda para el Dise\u00f1o T\u00e9cnico de Plantas Fotovoltaicas de 2\u00d71 MW<\/h2>\n\n\n\n<p>Para cada uno de los dos sitios, se llev\u00f3 a cabo una revisi\u00f3n detallada del dise\u00f1o t\u00e9cnico, basado en la optimizaci\u00f3n de la interconexi\u00f3n, para crear una situaci\u00f3n \u201cwin-win\u201d en la que la m\u00e1xima energ\u00eda producida posible se entregue a TANESCO, permitiendo una fuerte reducci\u00f3n de el consumo de combustible. A partir de esta revisi\u00f3n preparamos la documentaci\u00f3n necesaria para las licitaciones oficiales, que comprende una descripci\u00f3n detallada de toda la configuraci\u00f3n de la instalaci\u00f3n, incluidos los componentes de la l\u00ednea el\u00e9ctrica, los trabajos de construcci\u00f3n de las cajas o postes de conexi\u00f3n, la puesta a tierra, los m\u00e9todos de protecci\u00f3n contra rayos y sobretensiones. Estos informes tambi\u00e9n conten\u00edan la estimaci\u00f3n de costos de todo el hardware, transporte e instalaci\u00f3n necesarios.<\/p>","protected":false},"featured_media":1724,"parent":0,"menu_order":0,"template":"","zone":[55],"project_category":[24],"supply":[57],"budget":[],"country":[],"class_list":["post-1602","projects","type-projects","status-publish","has-post-thumbnail","hentry","zone-sub-saharan-africa","project_category-sustainable-generation","supply-power"],"acf":[],"_links":{"self":[{"href":"https:\/\/www.mai.group\/es\/wp-json\/wp\/v2\/projects\/1602","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.mai.group\/es\/wp-json\/wp\/v2\/projects"}],"about":[{"href":"https:\/\/www.mai.group\/es\/wp-json\/wp\/v2\/types\/projects"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.mai.group\/es\/wp-json\/wp\/v2\/media\/1724"}],"wp:attachment":[{"href":"https:\/\/www.mai.group\/es\/wp-json\/wp\/v2\/media?parent=1602"}],"wp:term":[{"taxonomy":"zone","embeddable":true,"href":"https:\/\/www.mai.group\/es\/wp-json\/wp\/v2\/zone?post=1602"},{"taxonomy":"project_category","embeddable":true,"href":"https:\/\/www.mai.group\/es\/wp-json\/wp\/v2\/project_category?post=1602"},{"taxonomy":"supply","embeddable":true,"href":"https:\/\/www.mai.group\/es\/wp-json\/wp\/v2\/supply?post=1602"},{"taxonomy":"budget","embeddable":true,"href":"https:\/\/www.mai.group\/es\/wp-json\/wp\/v2\/budget?post=1602"},{"taxonomy":"country","embeddable":true,"href":"https:\/\/www.mai.group\/es\/wp-json\/wp\/v2\/country?post=1602"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}