{"id":5395,"date":"2021-10-04T14:41:58","date_gmt":"2021-10-04T12:41:58","guid":{"rendered":"https:\/\/www.mercadosaries.com\/?p=5395"},"modified":"2022-10-28T13:44:52","modified_gmt":"2022-10-28T11:44:52","slug":"owners-engineering-services-for-titan-pv-projects","status":"publish","type":"post","link":"https:\/\/www.mai.group\/es\/owners-engineering-services-for-titan-pv-projects\/","title":{"rendered":"Servicios de ingenier\u00eda del propietario para proyectos fotovoltaicos Titan"},"content":{"rendered":"<p>Teniendo en cuenta la enorme experiencia de <strong>Mercados \u2013 Aries Internacional<\/strong> En servicios de Ingenier\u00eda de Propietarios en Proyectos Fotovoltaicos en todo el mundo, GALP ha firmado con MAI un contrato para desarrollar estos servicios en Espa\u00f1a para el Proyecto Titan Lote 1 con un total de Plantas Fotovoltaicas de 285 MW (incluyendo subestaciones y l\u00edneas de transmisi\u00f3n): Alc\u00e1zar I, II y III, Perea &amp; Veg\u00f3n y Manzanares.<\/p>\n\n\n\n<p>El alcance de las obras comprende, entre otros, la revisi\u00f3n del Contrato EPC, PPA y Contrato O&amp;M antes de su ejecuci\u00f3n, la revisi\u00f3n de los aspectos de calidad del Proyecto y sobre todo la supervisi\u00f3n de la actividad del personal del contratista principal en las obras (verificaci\u00f3n de los trabajos de construcci\u00f3n). progreso, control y verificaci\u00f3n de los materiales y recursos utilizados en las obras de construcci\u00f3n, revisi\u00f3n t\u00e9cnica de la planta asegurando que las plantas solares cumplan con los requisitos de calidad y est\u00e1ndares (MC, COD, PAC, etc.), para lo cual MAI habr\u00e1 movilizado Un equipo de gesti\u00f3n in situ (20 pax.) para satisfacer todos estos requisitos.<\/p>\n\n\n\n<p>MAI es pionera en generaci\u00f3n de energ\u00eda fotovoltaica a escala de servicios p\u00fablicos, habiendo completado el proceso de licitaci\u00f3n IPP y EPC y la supervisi\u00f3n de la construcci\u00f3n, puesta en marcha y operaci\u00f3n y mantenimiento de varios proyectos. Adem\u00e1s, MAI ha realizado asesoramiento t\u00e9cnico, ingenier\u00eda de detalle y servicios llave en mano para m\u00e1s de 12.000 MW de plantas de energ\u00eda solar fotovoltaica en todo el mundo.<\/p>","protected":false},"excerpt":{"rendered":"<p>Considering the huge experience of Mercados &#8211; Aries International in Owner\u00b4s Engineering services in PV Projects around the world, GALP has signed with MAI a contract to develop these services in Spain for Titan Project Batch 1 with a total of 285 MW PV Plants (including substations and transmission lines): Alcazar I, II and III, [&hellip;]<\/p>\n","protected":false},"author":9,"featured_media":5398,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"_seopress_robots_primary_cat":"","_seopress_titles_title":"","_seopress_titles_desc":"","_seopress_robots_index":"","footnotes":""},"categories":[28,36],"tags":[],"class_list":["post-5395","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news","category-projects"],"acf":[],"_links":{"self":[{"href":"https:\/\/www.mai.group\/es\/wp-json\/wp\/v2\/posts\/5395","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.mai.group\/es\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.mai.group\/es\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.mai.group\/es\/wp-json\/wp\/v2\/users\/9"}],"replies":[{"embeddable":true,"href":"https:\/\/www.mai.group\/es\/wp-json\/wp\/v2\/comments?post=5395"}],"version-history":[{"count":0,"href":"https:\/\/www.mai.group\/es\/wp-json\/wp\/v2\/posts\/5395\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.mai.group\/es\/wp-json\/wp\/v2\/media\/5398"}],"wp:attachment":[{"href":"https:\/\/www.mai.group\/es\/wp-json\/wp\/v2\/media?parent=5395"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.mai.group\/es\/wp-json\/wp\/v2\/categories?post=5395"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.mai.group\/es\/wp-json\/wp\/v2\/tags?post=5395"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}