{"id":11616,"date":"2022-11-14T13:52:47","date_gmt":"2022-11-14T12:52:47","guid":{"rendered":"https:\/\/www.mercadosaries.com\/?p=11616"},"modified":"2022-11-14T13:52:48","modified_gmt":"2022-11-14T12:52:48","slug":"technical-advisory-services-for-tender-process-of-2-x-500-mwac-pv-in-oman","status":"publish","type":"post","link":"https:\/\/www.mai.group\/es\/technical-advisory-services-for-tender-process-of-2-x-500-mwac-pv-in-oman\/","title":{"rendered":"Servicios de asesoramiento t\u00e9cnico para la licitaci\u00f3n de 2 x 500 MWac fotovoltaicos en Om\u00e1n"},"content":{"rendered":"<p>Estamos muy orgullosos de brindar servicios de asesoramiento t\u00e9cnico para dos proyectos IPP de energ\u00eda solar fotovoltaica con una capacidad combinada de 1 GWac en Om\u00e1n, apoyando al cliente con los aspectos t\u00e9cnicos de la oferta durante el proceso de licitaci\u00f3n lanzado para el desarrollo, dise\u00f1o, permisos e ingenier\u00eda. , financiaci\u00f3n, adquisiciones, construcci\u00f3n, puesta en marcha, pruebas, terminaci\u00f3n, propiedad, seguro, operaci\u00f3n y mantenimiento de ambas plantas. <\/p>","protected":false},"excerpt":{"rendered":"<p>We are very proud to provide Technical Advisory Services for two Solar PV IPP Projects with a combined capacity of 1 GWac in Oman, by supporting the Client with the technical aspects of the bid during the tender process launched for the development, design, permitting, engineering, financing, procurement, construction, commissioning, testing, completion, ownership, insurance, operation [&hellip;]<\/p>\n","protected":false},"author":9,"featured_media":6774,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"_seopress_robots_primary_cat":"","_seopress_titles_title":"","_seopress_titles_desc":"","_seopress_robots_index":"","footnotes":""},"categories":[28,36,26],"tags":[],"class_list":["post-11616","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news","category-projects","category-renewables"],"acf":[],"_links":{"self":[{"href":"https:\/\/www.mai.group\/es\/wp-json\/wp\/v2\/posts\/11616","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.mai.group\/es\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.mai.group\/es\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.mai.group\/es\/wp-json\/wp\/v2\/users\/9"}],"replies":[{"embeddable":true,"href":"https:\/\/www.mai.group\/es\/wp-json\/wp\/v2\/comments?post=11616"}],"version-history":[{"count":3,"href":"https:\/\/www.mai.group\/es\/wp-json\/wp\/v2\/posts\/11616\/revisions"}],"predecessor-version":[{"id":11622,"href":"https:\/\/www.mai.group\/es\/wp-json\/wp\/v2\/posts\/11616\/revisions\/11622"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.mai.group\/es\/wp-json\/wp\/v2\/media\/6774"}],"wp:attachment":[{"href":"https:\/\/www.mai.group\/es\/wp-json\/wp\/v2\/media?parent=11616"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.mai.group\/es\/wp-json\/wp\/v2\/categories?post=11616"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.mai.group\/es\/wp-json\/wp\/v2\/tags?post=11616"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}